CHOOSING THE IDEAL LOCATION FOR INSTALLING PHOTOVOLTAIC PANELS PRODUCTION UNITS IN BRAZIL, USING AHP (Analytic Hierarchy Process)

CHOOSING THE IDEAL LOCATION FOR INSTALLING PHOTOVOLTAIC PANELS PRODUCTION UNITS IN BRAZIL, USING AHP (Analytic Hierarchy Process)

ARRUDA, CARLOS ALBERTO DE ; LEPIKSON, HERMAN AUGUSTO ;

Completo:

"This study aims to rank criteria for siting photovoltaic panel production in Brazil using the Analytic Hierarchy Process (AHP). With Brazil's potential in solar energy, strategic site selection is key for sector competitiveness. Criteria included technical, economic, and logistical aspects. The Southeast Region emerged as the most suitable due to logistical benefits and raw material proximity. Findings are relevant for investors and policymakers, highlighting the Southeast as the focal point for Brazil's photovoltaic industry development. Despite AHP's subjectivity and secondary data reliance, the approach is effective for solar sector strategic decisions. Future research should broaden the scope and integrate more methods to strengthen results. "

Completo:

"This study aims to rank criteria for siting photovoltaic panel production in Brazil using the Analytic Hierarchy Process (AHP). With Brazil's potential in solar energy, strategic site selection is key for sector competitiveness. Criteria included technical, economic, and logistical aspects. The Southeast Region emerged as the most suitable due to logistical benefits and raw material proximity. Findings are relevant for investors and policymakers, highlighting the Southeast as the focal point for Brazil's photovoltaic industry development. Despite AHP's subjectivity and secondary data reliance, the approach is effective for solar sector strategic decisions. Future research should broaden the scope and integrate more methods to strengthen results. "

Palavras-chave: Solar Energy, Photovoltaic Panels, Multicriteria Analysis, Industrial Location, AHP (Analytic Hierarchy Process),

Palavras-chave: Solar Energy, Photovoltaic Panels, Multicriteria Analysis, Industrial Location, AHP (Analytic Hierarchy Process),

DOI: 10.5151/siintec2024-397706

Referências bibliográficas
  • [1] "1 REN21 – Renewable Energy Policy Network for the 21st Century. Renewables 2023
  • [2] Global Status Report. Paris, 2023.
  • [3] 2
  • [4] ABENS – Associação Brasileira de Energia Solar. Relatório Anual de Energia Solar
  • [5] 2023. São Paulo, 2023.
  • [6] 3ANEEL – Agência Nacional de Energia Elétrica. Panorama da Geração Distribuída
  • [7] no Brasil, 2022.
  • [8] 4MMA – Ministério do Meio Ambiente. Estratégias para a Promoção da Energia
  • [9] Solar no Brasil. Brasília, 2022.
  • [10] 5WEBER, A. Theory of the Location of Industries. Chicago: The University of
  • [11] Chicago Press, 1929.
  • [12] 6SAATY, T. L. The Analytic Hierarchy Process: Planning, Priority Setting, Resource
  • [13] Allocation. New York: McGraw-Hill, 1980.
  • [14] 7GOMES, C. F., et al. Análise Multicritério Aplicada à Localização Industrial: Um
  • [15] Estudo de Caso Utilizando AHP. Revista Gestão e Produção, v. 16, n. 1, p. 79-92,
  • [16] 2009.
  • [17] 8CARVALHO, A. Processo Siemens para a Produção de Silício Grau Solar.
  • [18] Revista Brasileira de Energia, v. 20, n. 3, p. 45-56, 2014.
  • [19] 9ABRADEE – Associação Brasileira de Distribuidores de Energia Elétrica. Incentivos
  • [20] Fiscais e Políticas Públicas para o Setor Energético, 2023.
  • [21] 10IEA – International Energy Agency. Global Energy Outlook 2023. Paris, 2023."
Como citar:

ARRUDA, CARLOS ALBERTO DE; LEPIKSON, HERMAN AUGUSTO; "CHOOSING THE IDEAL LOCATION FOR INSTALLING PHOTOVOLTAIC PANELS PRODUCTION UNITS IN BRAZIL, USING AHP (Analytic Hierarchy Process)", p. 678-684 . In: . São Paulo: Blucher, 2024.
ISSN 2357-7592, DOI 10.5151/siintec2024-397706

últimos 30 dias | último ano | desde a publicação


downloads


visualizações


indexações