Novembro 2016 vol. 3 num. 1 - XX Congreso de la Sociedad Iberoamericana de Gráfica Digital
Full Article - Open Access.
A implantação de BIM: usos, atividades e processos na fase inicial da projetação
Pereira, Ana Paula Carvalho ; Amorim, Arivaldo Leão de ;
Full Article:
There is a need to develop knowledge of BIM in Brazil, because it enable the integration of phases of the building life cycle, contributing to the management of activities, making it possible improve the quality of the product, reducing conflicts between disciplines, rework, fostering communication among those involved etc. However, for the BIM to be incorporated, it is necessary to restructure the project process, so that there is greater collaboration between designers. So, the uses, activities and procedures are proposed on project management, aiming the implementation of BIM.
Full Article:
Palavras-chave: BIM; Project process; Lifecycle of the building; Process model; Collaborative work,
Palavras-chave: ,
DOI: 10.5151/despro-sigradi2016-470
Referências bibliográficas
- [1] ABPMP – Association of Business Process Professionals. (2013). BPM CBOK - Guia para o Gerenciamento de Processos de Negócio – Corpo Comum de Conhecimento. (400 p.). Disponível em: < Disponível em: http://c.ymcdn.com/sites/www.abpmp.org /resource/resmgr/Docs/ ABPMP_CBOK_Guide_Portuguese.pdf.
- [2] AIA – THE AMERICAN INSTITUTE OF ARCHITECTS (2008) National Documents Committee. Document E202 – Building Information Modeling Protocol Exhibit. Washington, DC.
- [3] ANDRADE, M. L. V. X.; RUSCHEL, R. C. (2009) BIM: conceitos, cenário das pesquisas publicadas no Brasil e tendências. In: WORKSHOP BRASILEIRO GESTÃO DO PROCESSO DE PROJETO NA CONSTRUÇÃO DE EDIFÍCIOS, 9., São Carlos. Anais... São Paulo: USP.
- [4] ARAYICI, Y.; COATES, P.; KOSKELA, L.; KAGIOGLOU, M.; USHER, C.; O'REILLY, K. (2011). Technology adoption in the BIM implementation for lean architectural practice. Automation in Construction, v. 20, Issue 2, p. 189-195.
- [5] CAMBIAGUI, H.; AMÁ. R. (2006). Manual de Escopo de Projetos e Serviços de Arquitetura e Urbanismo. São Paulo: AsBEA, 2006. Disponível em:
- [6] CIC - Computer Integrated Construction Research Program. The Pennsylvania State University (2011). BIM Project Execution Planning Guide, v. 2.1, 125 p. Disponível em:
- [7] EASTMAN, C. M. (1999). Building product models: computer environments supporting design and construction. Boca Raton: CRC Press, 411 p.
- [8] EASTMAN, C. M.; TEICHOLZ, P.; SACKS, R.; LISTON, K. (2011).BIM Handbook: a guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. 2. ed. New Jersey: John Wiley& Sons, 684 p.
- [9] KOSKELA, L. (1992).Application of the New Production philosophy to Construction.Technical Report n. 72.Center for Integrated Facility Engineering.Department of Civil Engineering.Stanford University, 72 p.
- [10] KYMMELL, W. (2008). Building Information Modeling: Planning and Managing Construction Projects with 4D and Simulations. New York: McGraw-Hill, 296 p.
Como citar:
Pereira, Ana Paula Carvalho; Amorim, Arivaldo Leão de; "A implantação de BIM: usos, atividades e processos na fase inicial da projetação", p. 497-504 . In: XX Congreso de la Sociedad Iberoamericana de Gráfica Digital [=Blucher Design Proceedings, v.3 n.1].
São Paulo: Blucher,
2016.
ISSN 2318-6968,
DOI 10.5151/despro-sigradi2016-470
últimos 30 dias | último ano | desde a publicação
downloads
visualizações
indexações